01 · Frameworks and controls

The register everything else hangs off.

SOC 2 (61), ISO/IEC 27001:2022 (93) and PCI DSS v4.0.1 (63), loaded on first boot. Each control has an objective, a status, an owner and its evidence.

Readiness is arithmetic. Implemented ÷ applicable, per framework. Marking a control not applicable is recorded in the audit trail.
grc.yourcompany.com/controls

A crosswalk underneath

Twenty themes tie the libraries together, so one policy can answer CC6.1, A.5.15 and 7.1.

Links go both ways

Map evidence from the control or the document. It is the same link either way.

Owners are real accounts

A person with a login, not a text field, so reminders reach someone.

02 · Documents and evidence

A folder tree generated from the standards.

Framework, then category, then control, with your own subfolders wherever you want them.

grc.yourcompany.com/documents
grc.yourcompany.com/documents · viewer
Lifecycle

Versions, not overwrites

Old versions stay retrievable for when the auditor asks what the policy said last spring.

Reminders

The clock that runs itself

Owners are emailed at 30, 14, 7 and 1 days out, and once when a review is overdue.

Access

Grants that inherit

View, edit or manage per folder, by role or person, inherited downward. Auditors are capped at view.

Open in browser

Review evidence without downloading it.

  • PDFs drawn by pdf.js, with no scripting from the file
  • Images shown only after a check of the actual bytes
  • Word and Excel parsed on the server and rendered as structure, never as the file's own markup

03 · Dashboard and analytics

Numbers with a provenance.

Readiness is snapshotted daily, so the trend you show the board can be reproduced.

grc.yourcompany.com/dashboard
grc.yourcompany.com/analytics

Lead schedule

One row per framework, from applicable controls to evidence linked and readiness.

Coverage atlas

One square per control. Point at one and its crosswalk partners light up in every framework.

Notification tray

What is due for you, with an optional daily or weekly digest.

grc.yourcompany.com/risks

04 · Risk register

Five by five, with a paper trail.

Likelihood × impact, treatment, owner, due date and a note trail on every risk.

  • Imports CSV and XLSX, including word scales like Likely and Almost certain
  • Skips duplicates instead of creating a second copy
  • An auditor's exception lands in the register in one click

05 · Access reviews and the audit trail

Two screens that answer most of the questions.

grc.yourcompany.com/user-audit

Access reviews

Every account is snapshotted, so the grid cannot shift under you. A finished review is read-only evidence.

grc.yourcompany.com/audit-log

Audit trail

Field names, never values. There is no API to edit or delete an entry.

06 · Vendors and shared responsibility

Third-party risk, computed rather than asserted.

grc.yourcompany.com/vendors
grc.yourcompany.com/responsibilities

Assurance on file

SOC 2 reports, ISO certificates, AOCs and DPAs, each with an expiry that drives the rating.

The matrix importer

Reads a vendor's matrix in whatever shape it arrives. Nothing is saved until you confirm.

The questionnaire, sent out

A personal, expiring link. The vendor answers without an account and you accept or reject.

One Accountable per control, enforced by the API. Controls with none are counted.

07 · Audit packages

The feature the rest of
the product exists to feed.

Sealed, signed, issued to named auditors for a fixed window, and verified offline without us.

grc.yourcompany.com/packages

What sealing does

  • Snapshots every control and file, with its SHA-256, into one manifest
  • Signs it with Ed25519, using a key kept outside the database
  • Freezes the package. A file swapped later is named at export: the seal detects a substitution, it does not prevent one

What the auditor gets

  • Access to the pinned files and the request-list answers, and nothing else
  • Design and operating conclusions the API will not let you edit
  • A ZIP that verifies itself with a stdlib-only verify.py

Sampling

You state the population. The auditor records a verdict per item.

Roll-forward

Next year's package from this year's, with what changed in between.

PBC request list

Each request assigned, dated and chased until answered.

What the auditor runs, on their own machine
$ unzip conformiti-package-fy26-soc2.zip && cd conformiti-package-fy26-soc2
$ sha256sum -c SHA256SUMS
evidence/access-control-policy-v4.pdf: OK
evidence/user-access-review-2026-Q1.csv: OK
…
$ python3 verify.py
manifest digest   d41f0e…9ab2   OK
signature        Ed25519       OK  (key 8c:1a:…:e7)
files            214/214       OK
# no network, no dependencies, no vendor involvement

08 · The rest of the governance calendar

Meetings, groups and the ticket board.

Proof the program is run by people, on a cadence, with minutes.

Meetings

A required cadence per series, and a badge that knows what is due so far this year.

Champion groups

Who speaks for which part of the business, with one accountable owner.

Jira optional

Read-only boards for everyone, without a Jira seat. The token never reaches the browser.

09 · Identity, roles and settings

Five roles, folder grants,
and an API that means it.

The API enforces every capability. A hidden button is never the security model.

  • TOTP and passkeys, with backup codes. A possibly cloned key is disabled and the sign-in refused.
  • OIDC and SAML 2.0, configured from the environment only, with step-up MFA when the provider asserted none.
  • No self-lockout, and never an organisation without an active administrator.
Built-in roles and their capabilities
RoleManage usersManage frameworks Manage documentsManage folders View allAuditor
Administrator✓✓✓✓✓No
Compliance ManagerNo✓✓✓✓No
Control OwnerNoNogranted foldersNoNoNo
AuditorNoNoNoNoregisters read-only; documents by grant✓
ViewerNoNoNoNoNoNo

Custom roles use the same flags. Auditor roles are always capped at view.

10 · Workspaces

One installation, several organisations.

Every organisation-owned row belongs to a workspace, and the filter is applied in the data layer, so a view that forgets to scope still cannot leak.

  • Archive a workspace and its people are signed out. Nothing is deleted.
  • Each workspace gets its own reminders, mailbox and Slack or Teams channel.
  • An existing install becomes one workspace called Default and never notices.

Who this is for

MSPs and consultanciesEach client's program on one deployment. Enterprise adds one console across all of them.
GroupsSeveral regulated entities, with separate scopes and auditors.
Separate certificationsA PCI subsidiary kept apart from the group's ISO program.

Single sign-on and the signing key are installation-wide. Passkeys and second factors belong to the person.

Editions

Everything above is
the free build.

Every screen on this page ships in Core, AGPL-3.0 licensed, with nothing switched off.

Pro

The Conformy assistant, control testing, a trust centre and 27 compliance packs.

Enterprise

Everything in Pro, plus one console for every client.

Next

Read the code, or run it.

Both take about a minute, and nothing stands between you and either.